History of Vessel:
The USS Eagle was commissioned in 2289 in a ceremony at Utopia Planitia Fleet Yards.
She left spacedock on August 1, 2290, to test her impulse engines and other systems in the Terran Solar system..
On November 2290, shakedown trials for her warp engines and other related systems were completed. Modifications to the warp core assemble drive and long range sensors were made..
In 2293, the USS Eagle was severely damaged in Romulan attack. She was sent to Starbase Six for repairs and assigned a new mission..
To prepare the USS Eagle for a very delicate diplomatic mission with the Galadonese and the Tureth, many upgrades were added. Among them were the following: sensor and weapon systems, new security systems, defensive systems, hull reinforcement, and living quarters upgraded for the comfort and prestige of high level diplomats. The exact nature of the upgrades is classified..